Shopping malls
"FOCUS MALL" shopping mall in Zielona Góra
Construction site: "FOCUS MALL" shopping mall in Zielona Góra
General Contractor / Employer: Mostostal Warszawa S.A.
Implementation: I Q 2019 – IV Q 2020
Scope of works: installation of sanitary systems including preparation of detailed designs
"Wroclavia" shopping mall in Wrocław
Construction site: "Wroclavia" shopping mall in Wrocław
Investor / Employer: WOOD Sp. z o.o.
Implementation: IV Q 2015 – I Q 2018
Scope of works: installation of high-current systems, including preparation of detailed designs
"Zielone Arkady" shopping mall in Bydgoszcz
Construction site: "Zielone Arkady" shopping mall in Bydgoszcz
General Contractor / Employer: STRABAG Sp. z o.o.
Implementation: I Q 2014 – II Q 2016
Scope of works: installation of high-current and low-current systems, including preparation of detailed designs
"Galeria Słoneczna" shopping center in Radom
Construction site: Shopping Centre – "Galeria Słoneczna" in Radom
Investor: AIG/Lincoln Polska sp. z o.o.
Employer: PORR (Polska) S.A.
Implementation: IV Q 2009 - III Q 2011
Total area: 11 000m²
Scope of works: power system including among others: 15 units of MV switchgear DRAWA, 7 transformators 2 MVA each, low voltage switchgears, condenser battery, 40 km cable conduits, 120 km cables and wiring, 1 km of busway with a total load of 2500 and 3200A, 8000 lighting fitting, UPS equipment, downhill road heating, lighting and electric shock protection installations, outdoor lighting installations and outdoor MV feeder cables, teletechnical installations, among others: fire alarm system, sound protecting system, burglary and rob bery signaling systems, acces control system, CCTV installation, intercom.
"Galeria Jurajska" shopping and entertainment centre in Częstochowa
Construction site: Shopping and entertainment centre – "Galeria Jurajska" in Częstochowa
Investor: Globe Trade Centre
Employer: Strabag
Implementation: I Q 2008 - III Q 2009
Scope of works: power systems, including, among others: delivery and assembly of power generator, medium voltage switchboards: 12 units, low voltage main switchboards with 6 units of 2000 kVA transformers, approx.900 km of cable conduits, approx. 9000 lamp fittings, as well as low current systems: fire signalling system, music amplification system and acoustic alarming system, data wiring, of satellite TV, CCTV, burglary and robbery signalling system, customers’ counting system, intercom and automation system, BMS.
"Focus Park" in Zielona Góra
Construction site: Two storey commercial and entertainment centre "Focus Park" in Zielona Góra
Investor: Parkridge C.E. Developments
Employer: Bovis Polska
Implementation: II Q 2007 - II Q 2008
Scope of works: assembly of over 11 km cable routes, 4 pieces of bus bridges and 9 pieces of bus bars, assembly of over 65 km cables and conductors, execution of earthing system and equipotential bonding, carrying out of structural grid for office serving whole object, assembly of over 3100 lighting fixtures (within internal lighting, as well as external car park and façade). Delivery and assembly of 10-switch bay MV Drawa switchgear, 2 LV stations and 25 department stations (also delivered by ZPUE Elektromontaz Poznan) for Focus Park Zielona Gora.
"Focus Park" in Bydgoszcz
Construction site: Commercial and entertainment centre "Focus Park" in Bydgoszcz
Investor: Parkridge C.E. Developments
Implementation: I Q 2007 - I Q 2008
Scope of works: external lighting system, low and medium voltage cable routes
"Old Brewery" in Poznań
Construction site: "Old Brewery" enlargement– stage II in Poznań
Investor: Fortis Sp. z o.o.
Implementation: III Q 2006 – I Q 2007
Scope of works: low current installations, including: GEMOS building management system, fire signalling system, sound warning system, fire doors automation, access control system, burglary and assault detection system, CCTV system as well as electrical and data communications installations for security systems.
„Forum” shopping and amusement centre in Gliwice
Construction site: „Forum” shopping and amusement centre in Gliwice
Investor: braaten + pedersen Denmark
Employer: BUDIMEX –DROMEX S.A
Overall area: 90 000 m2
Working period: III Q 2006- III Q 2007
Scope of works:
high current installations, including: transformer stations – 2 sets, transformers – 6 sets, LV main switchgears with capacitor batteries – 7 pcs., LV subswitchgears – 74 pcs., central battery, 250 kVA electrical generator, UPS power supplies, cable lines – 210 km, busways – 18 pcs., lighting – 10 000 pcs., cable routes – 14 km, heating of inroads, pipelines, gutters and roof grooves, lightning arrester installation
low current installations, including: SAP fire signalling system, DSO sound system, burglary and assault signalling system, SSWIN access control system, CCTV closed circuit television system, cable television system, video-interphone installation, structural wiring system, parking system, person counting system
IKEA Mall in Matarnia near Gdańsk
Construction site: IKEA Mall, in Matarnia near Gdańsk
Investor: IKEA Polska
Implementation: I Q 2005 - II Q 2006
Area: 40,000 m2
Cubature: 415,000 m3
Scope of works: outdoor lighting, telecommunications wiring, and high current services, including 4 x 1000 kVA transformer station, power generator unit, busways, and switchboards. The low current services included fire alarm, warning bells, telephone, CCTV, BMS wiring, and service monitoring. Documentation was engineered by Elektromontaż Poznań
IKEA Targówek Mall in Warsaw
Construction site: IKEA Targówek Mall in Warsaw
Investor: Inter IKEA Centre Polska SA
Area: 75,100 sqm
Cubature: 534,200 cbm
Implementation: III Q 2005 - I Q 2007
Scope of works: high and low current services, including fire alarm, access control, telephone, and CCTV. Medium voltage switchboards, low voltage main switchboard, secondary low voltage switchboards, indoor power supply wiring, 380V network, and lighting cables. Documentation was engineered by Elektromontaż Poznań
"Polimeni" in Gniezno
Construction site: "Polimeni" Shopping Mall in Gniezno
Investor: Polimeni International Sp. z o.o
Employer: Budimex Dromex Oddział Poznań
Implementation: III Q 2004 - II Q 2005
Area overall: ok. 16,000 m2
Cubature: 80,000 m3
Scope of works: high and low current services, including burglary alarm, TV, fire alarm, telephone, and theft prevention. 15/04kVA transformer, 15 kV terminal connecotr
Selgros Cash & Carry
Construction site: Selgros Cash & Carry in Katowice, Radom, Poznań, Szczecin, Łódź, Warsaw, and Wrocław
Employer: Selgros Ltd.
Implemetnation: 4 quarters
Area overall: 22,000sqm
Implementation: /of a standard facility/ 1,5 quarter
Cubature: 208,000 cbm
Scope of the works: high and low current electrical services, including 380V, wholesale hall lighting, shopping gallery lighting, 15/04 kV transformer, 630 kVA generator, UPS service, control and signalling service, and emergency lighting.
Auchan in Płock
Construction site: Auchan Mall in Płock
Investor: Auchan Polska
Employer: Trasko Inwest
Implementation: IV Q 2001 - II Q 2002
Scope of works: sub-switchgears, cabling, CANALIS busbars, 380V service, power sockets, indoor and outdoor lighting, fire alarm, radio & TV, call system for the disabled
Auchan in Rumia
Construction site: Auchan Rumia
Investor: Auchan Polska sp. z o.o.
Employer: Auchan Polska sp. z o.o.
Implementation: I Q 2007 - III Q 2007
Area: 11800 m² whole object
Scope of works: delivery and assembling of 2 transformers 1250 kVA and 1000 kVA diesel generator, 2 main LV switching stations, several dozens of object switchgears, carrying out of 17 km internal supply lines and 3.5 km of cable routes, 2 UPS (uninterruptible power supplies) 80 kVA and 20 kVA, and central emergency lighting battery bank having 44 kVA output.