Street, Road, and Motorway Lighting
the S-6 road on the sections: Goleniów – Nowogard and Kiełpino – Płoty
Construction site: the S-6 road on the sections: Goleniów – Nowogard and Kiełpino – Płoty
General Contractor / Employer: Budimex S.A.
Implementation: II Q 2018 – II Q 2019
Scope of works: design and construction of the Traffic Management System for S-6 road on the sections: Goleniów – Nowogard and Kiełpino – Płoty
Lighting of road tunnel under Kraków railway station
Construction site: Lighting of road tunnel under Kraków railway station
Employer: Budimex –Dromex S.A., South Region in Kraków
Implementation: IV Q 2006- I Q 2007
Tunnel length: 250 m
Scope of works: power supply for electrical switching stations and central batteries, installation of non-flammable cable routes, installation of lighting fittings, installation of evacuation lighting fittings, installation of cabling for basic, emergency and evacuation lighting fittings, installation of two sets of emergency lighting central battery, execution of power supply for electrical switching stations and central batteries using buried cables.
Rearrangement of Pawia St. and construction of Nowa Pawia St., Kraków
Construction site: Rearrangement of Pawia St. and construction of Nowa Pawia St. in Kraków
Investor: Kraków Municipality
Implementation: III Q 2005 - II Q 2007
Street length: 1500 m
Scope of works:
street lamps at Pawia and Nowa Pawia St. and their across streets, electric power service at the railway station subway, repositioning medium and low voltage cabling, setting new cabling lines, and 9 traffic light systems.